BODHIVA / DECISION NOTEIllustrative example · 08 September 2026

From enquiry to quote.
Where should we start?

This is a hypothetical example, not a client case study. All assumptions and scores below illustrate a decision method. They are not measured BODHIVA results or a quote for services.

1. The decision

A service business assembles quotations from three systems. Choose the smallest responsible experiment before committing to an AI build.

2. What we assume — and still need to learn

3. Compare credible alternatives

Gates before scores: No pilot proceeds without authorised data access, an accountable owner, an agreed review process and tolerable residual risk. A high average cannot override a failed gate. A failed gate means defer or redesign that option.

Scores are provisional judgements from 1 to 5. They must be replaced after workflow observation. Higher means better in every column. We use equal weights: a simple average, with no claim of statistical precision.

Initial comparison under the assumptions above
OptionValueFeasibilityControlAverage
Shared template + clear ownership3554.33
Rules-based data assembly4343.67
AI-assisted first draft4222.67
Change client approval process3222.33

Anchors: Value 1 = limited local convenience; 3 = plausible recurring benefit; 5 = evidence of a material operating gain. Feasibility 1 = major unknowns/dependencies; 3 = bounded integration work; 5 = readily trialled with current tools. Control 1 = weak ownership/review or high residual risk; 3 = manageable with explicit controls; 5 = clear ownership and reversible, inspectable outputs. Intermediate scores sit between the anchors.

Why these scores? A template is easy to inspect and reverse, although its value is unmeasured. Rules may remove copying but need tested access. AI may help drafting, but error behaviour, data handling and review effort remain unknown. Client approval changes require cooperation beyond this team. Ease of control does not establish the greatest possible impact.

4. Recommended first test

Trial a shared template and named owner first. Record preparation time, corrections and end-to-end turnaround against the existing process. Add rules-based assembly only if repetition and data access justify it. Compare AI assistance with that simpler baseline, including the time spent checking and correcting its output.

5. What would change the recommendation?

6. Pilot ownership and stop condition

Agree one workflow owner, a representative sample and a measurement period before testing. Establish baseline preparation time and correction rate. Human review reduces risk but does not guarantee errors will be detected. Record missed errors and review effort. Stop if the experiment increases critical errors, lacks authorised data access or cannot demonstrate a useful improvement against the baseline.

7. The next decision

At the agreed review point, decide to improve, expand or stop. A full implementation is a separate decision, with scope, costs and responsibilities agreed in advance.